Short, honest answers — including the ones where the answer is "no" or "not yet".
For dyed aramid 1313 fabric the standard threshold is 20,000 m per colour and 50,000 m per order. Every case is agreed individually, and smaller trial orders can be accepted, so tell us the real volume and we will say plainly what is workable. For machined parts, 500 pieces is the level at which the price becomes sensible — below that the setup cost dominates. For micro motors we quote per application, and prototypes start at one piece.
Machined parts: three working days from a complete drawing. Aramid fabric: within 24 hours once we know weight, colour reference and annual volume. Motors: three days of technical review, then a quotation.
Aramid: a lab dip matched to your colour reference is free of charge; the courier cost for the first sample is on the receiver's account. Machining: samples are quoted as a small batch. Motors: prototypes typically in seven days.
We hold no certificate in our own name at this stage, and we do not claim otherwise. What we can provide is flame test data (0.0 s afterflame, char length 33 mm warp / 29 mm weft) as a summary on request, third-party testing at your nominated laboratory, and full material composition and dye documentation for your own certification file.
EXW, ex-works, tax excluded — our quotations do not include VAT and we do not issue a VAT invoice; if you need a taxed invoice, we quote that separately. Payment terms are agreed per order.
No. We do not supply military-pattern camouflage, foreign military specifications or any item that requires an export licence, and we do not discuss end use in restricted destinations.
Xianyang, Shaanxi, China — about 30 km from Xi'an. Our manufacturing partners are in the same province, which is why textile, machining, machine tools and motors can be coordinated by one team.
Yes, by arrangement in advance. Because some lines run at partner facilities, we agree the audit scope and the site list before the visit.
Aramid: weight, colour reference, annual volume and whether the first order is a trial. Machining: the drawing, material, batch size and the tolerance that actually matters. Motors: application, envelope and duty cycle.